Santos: GLNG Project Gas Hubs

Project Name: Santos: GLNG Fairview Project Gas Hubs
Client: Clough Downer Joint Venture

Contract value: 16.5M
Our role:
Landpartners were awarded the survey contract with Clough Downer Joint Venture (CDJV) for the construction of HCS4 and HCS5 Gas Hubs & PCS01 & PCS03 facilities. From 2012 to 2014 we supplied a peak on-site workforce of 2 survey managers, 12 survey crews & 2 CAD draftsmen, LandPartners successfully delivered survey services for construction, as-built surveys and conformance reporting for the project including: Our crews were located on-site at Gas Hubs HCS4 and HCS5, in the GLNG project’s Fairview gas fields, East of Injune.

Construction
• Establishing site survey control.
• Topographic, audit and volume surveys.
• Detail surveys to determine tie-in points of existing facilities for design purposes.
• Construction set out surveys for concrete and steel structures.
• As-built surveys of all underground services and above ground structures.
• Machine control, including setup, modelling & calibrationsProduction of GIS and CAD data from field survey.
• CAD service: Client data management, clash analysis, 3D Modelling of all underground services, Preparation of Machine Control models for road construction, volume calculations and reporting, engineering calculations and general drafting

In addition to our commitments to Fluor and CDJV, Landpartners has provided surveying resources to a number of clients involved in the GLNG project. Our Scope of Works included Civil and Cadastral surveys on worksites around the Fairview, Roma and Wallumbilla regions.