Santos: GLNG Project Upstream

Project Name: Santos GLNG Upstream Fairview Hub Compressor Stations 4 & 5
Client: Fluor

Our role: Landpartners were the consulting surveyors for Fluor Australia Pty Limited (Fluor) on the Santos GLNG project from 2011 until 2014. Our involvement in the project covered Design, Construction and Commissioning phases. We supplied seven Survey Crews and a full time Survey Manager for the duration of our contract. Our main areas of work for Fluor’s GLNG activities were based around the Fairview and Roma gasfields. Our Scope of Works for Fluor involved:

FEED and Pre-construction
• Establishment of primary survey control network.
• Cultural Heritage (CH) surveys.
• Topographic surveys.
• Survey of major crossings for Engineering design.
• Tie-in surveys of existing infrastructure.
• Survey of cadastral boundaries to improve accuracy of GIS data sets and adjustment of DCDB boundaries.
• Production of GIS and CAD data from field survey to Santos and Fluor standards.
Construction
• Gas and water gathering line set out.
• Well pad construction set out and facilities set out surveys.
• Production of GIS and CAD data from field survey.
Post Construction – Plant and Machinery commissioning
• Survey certifications for mechanical plant and equipment. Level and positioning certification and verticality certification.